2018年2月22日 星期四

RSFS CFA & Ruff27 practice effect_撰寫進度總表

RSFS CFA
1. 2/12, methods.
2. 2/13, methods revised. Q: (1)以CFA, GLM關鍵字尋找model paper, 建立【結果】之內容。
3. 2/22, AMOS外掛套件:plugins/pattern matrix model builder 這是一個建立CFA model的選項。
4. 2/23, results prepare. 10 model papers.
5. 3/2, 10 model papers for results.


Ruff27 practice effect
1. 2/15, methods.
2. 2/22, methods revised.
3. 2/23, from ICC to SEM, MDC and practice effect, paired t test, effect size.
4. 3/2, complete table 1 and 2; 10 model papers.

沒有留言:

張貼留言

AOTA 2019 conference

2 poster, 2019 April 4-7, spring holidays. CAAT & COMET 2019-2021, 科技部計畫: (1) working memory (2) IADL, leisure, & social partic...